The CALA project is for bid acceptance by January 2014. This 47 km expressway starts from CAVITEX and ends at Mamplasan interchange of South Luzon Expressway (SLEX).
Strategically located, Lancaster is right beside the expressway--another accessibility advantage aside from the existing routes.
Strategically located, Lancaster is right beside the expressway--another accessibility advantage aside from the existing routes.